Umbilical Clamp Handling System

CUSTOMER FTO Services
CHALLENGE The safe uprighting and installation of a 3m long clamp in a vessel moonpool area prior to subsea well intervention operations
SCOPE OF WORK Fast track design of 20t SWL handling system and on site engineering support for manufacture in US using clients existing supply chain
RESULT Reduction in umbilical deployment durations with associated cost saving and increase in operational safety levels