Umbilical Clamp Handling System
| CUSTOMER | FTO Services |
| CHALLENGE | The safe uprighting and installation of a 3m long clamp in a vessel moonpool area prior to subsea well intervention operations |
| SCOPE OF WORK | Fast track design of 20t SWL handling system and on site engineering support for manufacture in US using clients existing supply chain |
| RESULT | Reduction in umbilical deployment durations with associated cost saving and increase in operational safety levels |

